This five story, 129 unit and 165 bed assisted living facility features roof top courtyards and cold water therapy pool and totals 121,000 SF and $29 million of new construction. Structural design adapts to the bay mud fill with a 4 foot mat-slab foundation which required a 4,000 cubic yard concrete pour for 18 continuous hours.
ARCHITECT: Kava Massih Architects
CONTRACTOR: Roberts Obayashi